Go to Welcome Page

Operating Guide

Version 3.3

What’s New

System Manuals

User Operations

Managing Operations

Outputs and Records

Administration

User Operations

Basics

My Summary

Portal / Mobile Device

Useful

Glossary

Managing Operations

SMCR (Accountability UK)

Compliance

Risk

KRIs

Events

Registers

Contracts

Control Inventory

Document Library

Obligations

Triage PRO

Outputs and Records

Dashboards

Reports Charts Adhoc Stats

Record Management

Alerts

Administration

Configuration & Maintenance

Current Tasks

Security

Monitor

Audit Trail

Work with Risk Treatments

Page contents

Overview

Procedures Treatments

Completing a Risk Treatment Current Task

Overview

About a New Treatment

A Treatment is the given name of the Risk task.

A task is made of four main elements:

A Task is an instruction or action required to be completed by a specific date. The Task maybe required to be carried out by more than one position. The Task will either be required to be performed once (adhoc), or to be performed on a cyclic roll.

On the first reminder day, the Task is generated into a Current Task. The Current Task contains the instructions and the Due Date, but is its only entity, separate from the Treatment (template) it was created from. A separate Current Task is generated to each Actioned By Position. Each Actioned By Position will complete their own Current Tasks.

New Task Notifications

A new task notification will be sent on the Reminder Day date. If the task has a second reminder, a notification will be sent on this date. If the task is Critical, and the task is not completed on the Due Date by the Critical time, a notification will be sent to the Actioned By on the Due Date at this time. If the task is not completed by the Due Date, a notification will be sent everyday the task is overdue to the Actioned By, until the task is complete.

Elements of a Treatment

Adding or Editing a Treatment reveals two tabs,

The Details tab

The Details tab contains general information about the Risk Treatment, such as the instruction or description required of this task, the Status, the Control Type, etc.

The 'Treatments Details' tab
The ‘Treatments Details’ tab
The Details tab elements
1 Risk number and Title
The Risk to which the new Treatment is being added.
2 Information icon
Click the icon to show information about the fields on this tab.
3 Save icon
After entering all required information on both tabs, click this icon to save this New Task.
Note: Highlighted alert messages are displayed against any required field that is empty when you click the ‘Save’ icon. These fields must contain a value before the Treatment can be saved.
4 Status selector field
Click this field and select the Status of the Treatment (see Record Status). An Active task will be generated into a Current Task on the 1st reminder date for each Actioned By. An Inactive task will only roll over on the Due Date and no Current Task(s) will be generated.
Tip: If you are pre-loading Risk Treatments for an organisational project or activity that hasn’t yet started, set the Treatment to ‘Inactive’. This prevents the system from generating any Current Tasks for this Treatment until you change the Status to ‘Active’.
5 Blind Task option
Tick this checkbox to set the Treatment as a Blind Task. (A Blind Task can be assigned to a Position that does not have ‘View’ or ‘Edit’ Security Rights to the parent Risk record, but a higher level of security is applied for these positions.)
6 Critical Task option
Tick this checkbox to set the Treatment as a Critical Task. If selected, an additional reminder notification will be sent if the task is not completed at the configured critical time on the Scheduled Due Date.
7 Control Type
Click this Selector to choose a Control Type that reflects the nature of the Treatment. By default, your choices are ‘Corrective’, ‘Detective’ and ‘Preventative’.
Note: Administrators: The Control Types can be edited by selecting Risk | Control Types from the Main Menu.
8 An Attachment is mandatory for Task Completion option
Tick this checkbox if you require the ‘Actioned By’ Position to upload an attachment in order to complete the Treatment. Current tasks generated from this task, will not display an Express Complete option, on the My Summary | Current Tasks tab, with this option on.
9 Outcome selector field
The Outcome allows more information about the completion of a task.
Attestation: Completion of the task is sufficient
True/False: A true or false response is required (e.g. All items where correct)
Yes/No: A yes or no response is required (e.g. At least 10 items were checked)
When ‘Pass / Fail’ or ‘Yes / No’ is select, an Outcome is mandatory to be selected on the generated Current Task.
Depending on configuration setting, Current Tasks with ‘Pass / Fail’ or ‘Yes / No’ Outcome will display as an Express Complete option on the My Summary | Current Tasks tab. Express completing this Current Task will default select the positive Outcome ‘Pass’ or ‘Yes’.
10 Outcome Label field
Applies where the Outcome is not Attestation.
Provide your own label.
Maximum of 100 characters allowed.
If the Outcome field is being used, then propose the question that the Position needs to answer in order to successfully complete the Task.
11 Task description field
Use the Text Editor to detail the steps necessary to complete the Task. These details are emailed to the ‘Actioned By’ Position, and are also displayed in the My Summary | Current Tasks tab, when a Task is generated.

The Schedule tab

The Schedule tab contains the schedule, the frequency, the Actioned By(s) and the Escalate Position.

Note: If custom fields have be configured for the Treatments, the tabs name will be named Schedule/Custom Fields.

The Treatments 'Schedule' tab
The Treatments ‘Schedule’ tab
The Schedule tab elements
13 Date Calculation selection
Note: Date Calculation only available when Frequency Monthly is selected.
Specific Date selected. Select the exact Date for the schedule to start. Selection Last working day of the period will, if the Next Due is not this date, change to the Next Due to this date, for that month, when Save is clicked.
Day of Week selected. Select the Week and the Day for the schedule to run on. Then select Next Due for the first date (month/year) this task will be scheduled. Clicking Save will adjust Next Due to match the selected Week and Day.
Working day selected. Select how many business working days into a month the schedule is to run on. Then select Next Due for the first date (month/year) this task will be scheduled. Clicking Save will adjust Next Due to match the Working day.
.
14 Frequency selection
Use these fields to set how often the Treatment should be performed (e.g. every 3 months). Your Interval options include Monthly, Weekly or Adhoc.
Adhoc: The cycle number is ignored as it is a once off Task. Leave this as zero
Weekly: Type or select a number, e.g. ‘2’ for fortnightly.
Monthly: Type or select a number, e.g. ‘3’ for quarterly, ‘12’ for annual.
Note: Selecting Frequency ‘Adhoc’ or ‘Weekly’ will remove the Date Calculation selections.
.
15 Next Due date picker
Use the Date/Time Selector to set the date on which the Treatment must first be completed.
(Scheduled) date field
After saving the schedule, a (Scheduled) date is then displayed to the right of the ‘Next Due’ field. This field displays the actual date that the next Task will be due. Quite often, the ‘Next Due’ and ‘Scheduled’ dates will be the same, but when the ‘Next Due’ date falls on a non-business day (e.g. weekend or public holiday) the ‘Scheduled’ date is set to the preceding business day; making the task due slightly earlier.
See ‘Task (Scheduled) date field’ in the Glossary for more information.

Tip: If you leave the ‘Next Due’ field blank, the record will be created, but a Task will never be generated. This can be useful if your organisation is not yet ready to start the Task and wants to specify the ‘Next Due’ date at a later time.

16 Last working day of the period selector
Select this checkbox to override the Next Due date to always be the last day of that month.
17 ‘Reminder 1st’ field
Is the number of days before the Treatment due date that the Task will be generated and each ‘Actioned By’ Position notified. If the day the Task is be be generated falls on a non-business day, the task will instead be generated on the first prior business day. This is the day the task will appear in each ‘Actioned By’ Current Tasks list. This is also the day each ‘Actioned By’ position will receive a notification email containing the Task details and when the Task is Due.
(Reminder Date) field
After saving the schedule, a (Reminder Date) is then displayed to the right of the ‘Reminder 1st’ field. This field displays the actual date (business day) that the next Task will be generated.
.
18 ‘Reminder 2nd’ field
For Treatments with a long lead time (i.e. 1st Reminder is set to a high number of days), set a lower number of days in the ‘2nd Reminder’ field so that an additional email notification is sent to each ‘Actioned By’ Position before the due date. The same non-working day principle as 1st Reminder applies to this 2nd Reminder.

Tip: Set this field to zero if you don’t want a 2nd Reminder sent for this Treatment.

19 Task Responsibility position selector
Select the Position that is ultimately responsible for the Treatment. This Position selected for this role can be different from the Risk Owned By. This position is required to be a member of a Security Group that has at least View access to the owning Risk record.
20 Escalate To position selector
Select the Position who will receive a notification email if the Treatment becomes overdue.
This Position receives ONE cc email: of the overdue email sent to any of the ‘Actioned By’ Position’s the day the Task becomes overdue (plus configured Escalation days).
If the ‘Escalate To’ field is left blank then the value will automatically default to the ‘Escalate To’ Position defined in the Security Centre Position’s settings.
If this Treatment Task Responsibility position should be receiving the overdue notification, select their position for this field also.
21 Actioned By
The list of Positions and Task Teams members that will each be generated a Current Task on the 1st Reminder date.
22 Click here to select Actioned By
Select one or more Positions in the Positions List to assign as ‘Actioned By’ Positions for the Treatment, then click Close to add those Positions to the ‘Actioned By’ field.

Tip: Instead of selecting multiple Positions in the list, consider using Task Teams. Task Teams are indicated by the (TT) symbol.

23 Custom Fields
Enter Custom Fields as required as they appear for you.

Note: If displayed, Custom Fields on your system will be different from this displayed example.

Procedures Treatments

Add a Treatment

Add Treatment tasks to maintain Risk items. Treatments can be scheduled cyclic, or on a Adhoc manual schedule.

  1. Access the Risk list page.

  2. Click on a Risk record in the list to open the The ‘Risk’ page. Click the Treatments tab. Click the New Task icon 1.

  3. The New Task window displays. Enter the required fields on the Details tab. (See The Details tab elements for more information on each field.) Then click the Schedule tab. Enter the required fields on the Schedule tab. (See The Schedule tab elements for more information on each field.) Click the Save icon 1 to save this new Task. (Or, click the Cancel icon 2 to stop adding the new Task.)

    Note: If you paste content, please review Paste From Word

  4. The new Task is displayed in the ‘Treatments’ list 1.

    Note: If the task was created ‘Inactive’, use the status filter 2 to display the record.

Edit a Treatment

  1. Access the Risk list page.

  2. Click on a Risk record in the list to open the The ‘Risk’ page. Click the Treatments tab. Click the Treatment record 1 to be edited.

  3. The Edit Task window displays. Update the required fields on the Details and Schedule tabs (see The Details tab elements) for more information on each field). Click the Save icon 1 to save the editing. (Or, click the Cancel icon 2 to abandon the editing.)

    Note: If you paste content, please review Paste From Word Note: Whenever you change the Due Date, new current tasks will be generate on the new 1st reminder date to the Actioned By list, period.

  4. A record saved confirming message will display.

Copy (Duplicate) a Treatment

Use the Treatment Copy functionality to duplicate an existing Treatment.

  1. Access the Risk list page.

  2. Click on a Risk record in the list to open the The ‘Risk’ page. Click the Treatments tab. Click the Copy this Treatment icon 1 of the record to be copied.

  3. The Copy Task window displays. Optionally, update the fields on the Details 1 and Schedule tabs (see The Details tab elements) for more information on each field). Click the Save icon 2 to save the copy. (Or, click the Cancel icon 3 to abandon the copy.)

    Note: If you paste content, please review Paste From Word

  4. A confirming message will display and the copied record 1 will display in the Treatments list.

Transfer (Move) a Treatment

You can transfer a Treatment (and its associated history if it exists) to another Risk to save time, or to restructure your data.

Note: Before transferring a Treatment, check that the ‘Actioned By’ Position(s) has at least ‘View’ Record Security Rights to the target Risk record. Otherwise, you will need to assign another ‘Actioned By’ Position who has these rights.

  1. Access the Risk list page.

  2. Click on a Risk record in the list to open the The ‘Risk’ page. Click the Treatments tab. Click the Transfer this Treatment icon 1 of the record to be moved.

  3. The Transfer Treatment window displays. Select the target Risk from the ‘To’ 1 drop-down list.

  4. A preview list of the existing Treatments for that Risk is displayed. This allows you see if a similar Treatment 1 already exists for this Risk. Click the Transfer icon 2 to complete the move. (Or, click the Cancel icon 3 to abandon the move.)

  5. The transferred Treatment will no longer appear in this Treatment list. The target Risk Treatment List contains the Treatment at the end of the list.

View Task Completion History

The ‘Show the Task Completion History’ icon only appears for those Treatments that have completed task(s).

Note: Only Positions allocated to a Security Group with ‘View’ or ‘Edit’ Record Security Rights can view a Treatment’s Task Completion History.

  1. Access the Risk list page.

  2. Click on a Risk record in the list to open the The ‘Risk’ page. Click the Treatments tab. Click the Show the Task Completion History icon 1 of the record to be viewed.

  3. The ‘Task Completion History’ window displays. The most recent completed task history record is displayed. If the ‘Due Date/Actioned By’ 1 field appears, it indicates that more one task completion history record exists for this Treatment. Click the ‘Due Date/Actioned By’ dropdown 1 to select the other Completed Task History records. Also click the Comments tab and the Attachments tab 2 to see that information for this History Record. If you have the correct security access, further comments can be added and removed, and attachments can be added or removed. Click the Close icon 3 when viewing is completed to close this window.

Update Task Completion History

Note: Only Positions that completed this task, or have been allocated to a Security Group with ‘Edit’ Record Security Rights can update a Treatment’s Completed Task History record.

  1. Open the Task Completion History window. Click the ‘Update History’ 1 icon.

  2. The ‘Update Task Completion History’ window displays. Enter a Reason 1 for the update in the Reason field. Change the ‘Actioned On’ 2 date if required. If the Outcome 3 for this task can be set to ‘Yes/No’ or ‘Pass/Fail’, this will display and you will be able to change the choice. Click the Save 4 icon to Update. Click the Cancel 5 icon to cancel the Update and close this window. Saved Updates will appear on the Comments tab.
    (Note:Depending on your system configuration, ‘Completed’ options may appear. Serious consideration needs to be given to ever changing this answer to ‘No’, as ‘No’ means this task will not ever be completed; it will be ‘Not Completed’.)

  3. If required, Click the Comments tab. Click Add Comments 1 icon to add new comments.

  4. The Add New Comment window displays. Enter a new Comment 1. Click the Save 2 icon to save this comment. (Click the Cancel 3 to cancel the save and close this window.)

  5. To edit a Comment, click the Edit icon 1.

  6. The Edit Comment window displays. Update the comment 1. Click the Click the Save 2 icon to save this comment.

  7. To delete a Comment, Click the Delete 1 icon. Click OK to confirm the delete.

  8. If required, click the Attachments tab. Drop the attachment files, or use Browse. The file(s) will remain displayed in the field before disappearing and reappearing in the Attachments list.

  9. Click the View 1 icon to view the attachment. Click the Delete 2 to delete the attachment.

Delete a Treatment

If the Treatment to be delete has task completion history that you would like to retain for audit or reporting purposes, it is recommend to instead change its Status to Inactive. Deleting a Treatment, along with it task completion history, is instant.

  1. Access the Risk list page.

  2. Click on a Risk record in the list to open the The ‘Risk’ page. Click the Treatments tab. Click the Delete icon 1 of the record to be deleted.

  3. The clearly worded last chance Confirm window is displayed. Click OK to delete, or click Cancel.

Completing a Risk Treatment Current Task

My Current Tasks

To see which tasks have been generated for you to complete, from the main menu, click the My Summary option.

If the Current Tasks tab appears, you have Current tasks you are required to complete. If this tab does not appear, you do not.

Look for, or filter by, Type Risk Treatments in the Current Tasks list.

Completion Options

  1. Depend on the task configuration and requirements, and the system configuration, you may have the option to Express complete 1 the task. The pencil icon complete option 2 will always be available. Click one of these icons to complete the task. The Express complete icon will not appear if the task requires a comment and/or an attachment.

Express Complete One Click

  1. If you system is configured for single click express completion, clicking the Express Complete 1 icon, will complete. Hovering over the Express complete icon will display the information the task will complete with. If this information requires amendments, do not click this icon; click the pencil icon instead, to complete the task.

Express Complete Two Clicks

  1. If you system is not configured for single click express completion, clicking the Express Complete 1 icon, will display a confirming window with the information complete the task will complete with. Hovering over the Express complete icon will displays a different message to the single click hover message. If the information in the displayed confirming window is correct, click Yes 2. Otherwise click No; the confirming window will close and the Complete the task window will open.

Complete the task

  1. Click the Complete the Task 1 icon to display the Complete Treatment window.

Changing the Actioned On date

  1. If you wish to change the Actioned On date from today to another date, select the new Actioned On 1 date.

Selecting an Outcome

  1. If the task has been setup as an Outcome task, select Yes/No or Pass/Fail 1 as required.

Adding a Comment

  1. To add a comment, click the Add Comment 1 icon.

  2. The Add Comment window displays. Enter in your text 1, then click the Save 2 icon; or click the Cancel icon to stop adding a comment.

Adding an Attachment

  1. To add an attachment, click the Attachments 1 tab. Drop file(s) in the Browse field, or click Browse 2 to locate and select the file(s) you wish to attach. Files can be also be attached one at a time. After a few seconds the files will re-appear into the File attachment list 3.

Completing the task

  1. To complete the Current Task, click the Complete Task 1 icon.

  2. If all required information is entered correctly, the task will complete and the window will close. If an error message appears, correct the error, then reattempt clicking the Complete Task 1 icon. Repeat until all errors no longer occur.

Page Contents Glossary