Completing a Contract Current Task
A task is made of four main elements:
A Task is an instruction or action required to be completed by a specific date. The Task maybe required to be carried out by more than one position. The Task will either be required to be performed once (adhoc), or to be performed on a cyclic roll.
On the first reminder day, the task is generated into a Current Task. The Current Task contains the instructions and the Due Date, but is its only entity, separate from the Task it was created from. A separate Current Task is generated to each Actioned By Position. Each Actioned By Position will complete their own Current Tasks.
A new task notification will be sent on the Reminder Day date. If the task has a second reminder, a notification will be sent on this date. If the task is Critical, and the task is not completed on the Due Date by the Critical time, a notification will be sent to the Actioned By on the Due Date at this time. If the task is not completed by the Due Date, a notification will be sent everyday the task is overdue to the Actioned By, until the task is complete.
Adding or Editing a Task reveals two tabs,
The Details tab contains the instruction or action required by this task.
The Schedule tab contains the schedule, the frequency, the Actioned By(s) and the Escalate Position.
Tip: If you leave the ‘Next Due’ field blank, the record will be created, but a Task will never be generated. This can be useful if your organisation is not yet ready to start the Task and wants to specify the ‘Next Due’ date at a later time.
Tip: Set this field to zero if you don’t want a 2nd Reminder sent for this Task.
Tip: Instead of selecting multiple Positions in the list, consider using Task Teams. Task Teams are indicated by the (TT) symbol.
Add Contract tasks to maintain Contract items. Contract Tasks can be scheduled cyclic, or on a Adhoc, one off time.
Access the Contracts list page. The ‘Contracts’ list page is displayed.
Click on the Contract record to display its details. The ‘Contract’ page is displayed with that record.
Click the Tasks tab. The Tasks tab is displayed. Click the New Task 1 icon.
The New Task
window displays. Enter the required fields on the Details
tab. (See The Details tab elements for more information on each field.) Then click the Schedule
tab. Enter the required fields on the Schedule
tab. (See The Schedule tab elements for more information on each field.) Click the Save icon 1 to save this new Task. (Or, click the Cancel icon 2 to stop adding the new Task.)
Note: If you paste content, please review Paste From Word
The new Task is displayed in the ‘Task’ list 1.
Note: If the task was created ‘Inactive’, use the status filter 2 to display the record.
Access the Contracts list page. The ‘Contracts’ list page is displayed.
Click on the Contract record to display its details. The ‘Contract’ page is displayed with that record.
Click the Tasks tab. The Tasks tab is displayed. Click the Task record 1 to be edited.
The Edit Task
window displays. Update the required fields on the Details
and Schedule
tabs (see The Details tab elements) for more information on each field). Click the Save icon 1 to save the editing. (Or, click the Cancel icon 2 to abandon the editing.)
Note: If you paste content, please review Paste From Word Note: Whenever you change the Due Date, new current tasks will be generate on the new 1st reminder date to the Actioned By list, period.
A record saved confirming message will display.
Use the Task Copy functionality to duplicate an existing Task
Access the Contracts list page. The ‘Contracts’ list page is displayed.
Click on the Contract record to display its details. The ‘Contract’ page is displayed with that record.
Click the Tasks tab. The Tasks tab is displayed. Click the Create a copy of this Task
1 icon of the record to be copied.
The Copy Task
window displays. Select a Task Type 1. Optionally, update the fields on the Details
and Schedule
tabs (see The Details tab elements) for more information on each field). Click the Save icon 2 to save the copy. (Or, click the Cancel icon 3 to abandon the copy.)
Note: If you paste content, please review Paste From Word
A confirming message will display and the copied record 1 will display in the Task list.
You can transfer a Task (and its associated history if it exists) to another Contract to save time, or to restructure your data.
Note: Before transferring a Task, check that the ‘Actioned By’ Position(s) has at least ‘View’ Record Security Rights to the target Contract. Otherwise, you will need to assign another ‘Actioned By’ Position who has these rights.
Access the Contracts list page. The ‘Contracts’ list page is displayed.
Click on the Contract record to display its details. The ‘Contract’ page is displayed with that record.
Click the Tasks tab. The Tasks tab is displayed. Click the Transfer this Task
1 icon of the record to be moved.
The Transfer Contract Task
window displays. Select the target Contract from the ‘To’ 1 drop-down list.
A preview list of the existing Tasks for that Contract is displayed. This allows you see all existing Tasks 1 to prevent creating a duplicate task. Click the Transfer 2 icon to complete the move. (Or, click the Cancel icon 3 to abandon the move.)
The transferred Task will no longer appear in this Task list. The target Contract Task List contains the task.
The ‘Show the Task Completion History’ icon only appears for those Contract Tasks that have completed task(s).
Note: Only Positions allocated to a Security Group with ‘View’ or ‘Edit’ Record Security Rights can view a Task’s, Task Completion History.
Access the Contracts list page. The ‘Contracts’ list page is displayed.
Click on the Contract record to display its details. The ‘Contract’ page is displayed with that record.
Click the Tasks tab. The Tasks tab is displayed. Click the Show the Task Completion History
1 icon of the record to be viewed.
The ‘Task Completion History’ window displays. The most recent completed task history record is displayed. If the ‘Due Date/Actioned By’ 1 field appears, it indicates that more one task completion history record exists for this Task. Click the ‘Due Date/Actioned By’ dropdown 1 to select the other Completed Task History records. Also click the Comments tab and the Attachments tab 2 to see that information for this History Record. If you have the correct security access, further comments can be added and removed, and attachments can be added or removed. Click the Close icon 3 when viewing is completed to close this window.
Note: Only Positions that completed this task, or have been allocated to a Security Group with ‘Edit’ Record Security Rights can update a Task’s Completed Task History record.
Open the Task Completion History window. Click the ‘Update History’ 1 icon.
The ‘Update Task Completion History’ window displays. Enter a Reason 1 for the update in the Reason field. Change the ‘Actioned On’ 3 date if required. If the Outcome 4 for this task can be set to ‘Yes/No’ or ‘Pass/Fail’, this will display and you will be able to change the choice. Click the Save 5 icon to Update. Click the Cancel 6 icon to cancel the Update and close this window. Saved Updates will appear on the Comments tab.
(Note:Depending on your system configuration, ‘Completed’ 2 options may appear. Serious consideration needs to be given to ever changing this answer to ‘No’, as ‘No’ means this task will not ever be completed; it will be ‘Not Completed’.)
If required, Click the Comments tab. Click Add Comments 1 icon to add new comments.
The Add New Comment
window displays. Enter a new Comment 1. Click the Save 2 icon to save this comment. (Click the Cancel 3 to cancel the save and close this window.)
To edit a Comment, click the Edit 1 icon.
The Edit Comment
window displays. Update the comment 1. Click the Click the Save 2 icon to save this comment.
To delete a Comment, Click the Delete 1 icon. Click OK
to confirm the delete.
If required, click the Attachments tab. Drop the attachment file(s) into the field, or use Browse to find the file(s). Each file will display for a few seconds in the field before disappearing and reappearing in the Attachments list during the upload processing.
Click the View 1 icon to view the attachment. Click the Delete 2 to delete the attachment.
If the Task to be delete has task completion history that you would like to retain for audit or reporting purposes, it is recommend to instead change its Status to Inactive. Deleting a Task, along with it’s task completion history, is instant.
Access the Contracts list page. The ‘Contracts’ list page is displayed.
Click on the Contract record to display its details. The ‘Contract’ page is displayed with that record.
Click the Tasks tab. The Tasks tab is displayed. Click the Delete
1 icon of the record to be deleted.
The clearly worded last chance Confirm window is displayed. Click OK to delete, or click Cancel.
To see which tasks have been generated for you to complete, from the main menu, click the My Summary option.
Click the Current Tasks tab.
Look for, or filter by, Type Contract Task in the Current Tasks list.
Depend on the task configuration and requirements, and the system configuration, you may have the option to Express complete 1 the task. The pencil icon complete option 2 will always be available. Click one of these icons to complete the task. The Express complete 1 icon will not appear if the task requires a comment and/or an attachment.
If you system is configured for single click express completion, clicking the Express Complete 1 icon, will complete. Hovering over the Express complete icon will display the information the task will complete with. If this information requires amendments, do not click this icon; click the pencil icon instead, to complete the task.
If you system is not configured for single click express completion, clicking the Express Complete 1 icon, will display a confirming window with the information complete the task will complete with. Hovering over the Express complete icon will displays a different message to the single click hover message. If the information in the displayed confirming window is correct, click Yes 2. Otherwise click No; the confirming window will close and the Complete the task window will open.
Click the Complete the Task 1 icon to display the Complete Contract Task window.
If you wish to change the Actioned On date from today to another date, select the new Actioned On 1 date.
If the task has been setup as an Outcome task, select Yes/No or Pass/Fail 1 as required.
To add a comment, click the Add Comment 1 icon.
The Add Comment window displays. Enter in your text 1, then click the Save 2 icon; or click the Cancel icon to stop adding a comment.
To add an attachment, click the Attachments 1 tab. Drop file(s) in the Browse field, or click Browse 2 to locate and select the file(s) you wish to attach. Files can be also be attached one at a time. After a few seconds the files will re-appear into the File attachment list 3.
To complete the Current Task, click the Complete Task 1 icon.
If all required information is entered correctly, the task will complete and the window will close. If an error message appears, correct the error, then reattempt clicking the Complete Task 1 icon. Repeat until all errors no longer occur.